The Maiyegun Story

From vision to reality, Maiyegun has been shaped through careful planning, engineering excellence, and steady progress.

Before Possession

- 2017 -

The site existed in its natural coastal state, characterized by low-lying terrain and exposure to tidal influences—highlighting the need for elevation, stabilization, and a well-planned transformation.

Laying the Foundation

- 2017 -

The journey began with large-scale dredging of the Atlantic Ocean, reclaiming over 800,000 cubic metres of sand. This critical step elevated the site, ensuring effective drainage and long-term land stability.

Building the Backbone

- 2019 -

Comprehensive infrastructure development commenced, including drainage systems, electrical networks, plumbing, sewage treatment, and other essential underground works—creating a solid framework for a modern community.

Securing the Shoreline

- 2021 -

With sustainability in focus, shoreline protection works were introduced, safeguarding the development against coastal erosion and reinforcing its resilience.

Bringing Homes to Life

- 2023 -

As infrastructure neared completion (90%), residential construction began, transforming plans on paper into vibrant, livable homes.

Maiyegun in Reality

- 2025 -

Sales were successfully concluded, marking a major milestone in the Maiyegun journey—with limited beachfront opportunities still available for those seeking an exclusive coastal experience.